Hyundai Pvt Ltd
Managed project schedules for a 200+ person unit using Primavera P6 and MS Project. Coordinated with cross-functional teams to monitor progress, identify delays, and implement corrective actions — achieving 95% on-time milestone delivery and reducing delay resolution time by 30%.
TVS Pvt Ltd
Inspected mechanical components against quality standards using calibrated tools and test protocols. Conducted material and system tests to identify defects, then collaborated with engineering teams to implement corrective actions — maintaining a defect escape rate below 1% and reducing rework by 15%.
Built LOD 350 architectural and structural BIM models in Revit, following the BIM Execution Plan (BEP) to ensure precise coordination. Ran clash detection in Navisworks Manage, identifying and resolving 60+ conflicts between structural, architectural, and MEP elements — eliminating on-site rework. Modeled complete MEP systems across 9 floors in Revit, coordinating all services to guarantee clash-free installation and full design compliance.
Delivered a coordinated LOD 350 federated model (Architecture + Structure + MEP) in Revit, resolving all critical clashes before construction began. Produced detailed construction drawings and documentation in AutoCAD, aligned with project specifications and client BEP requirements.
I am a Goalkeeper, we win 3 South Zones Matches